5 scissor lift in unfinished gym with one of them extended so a worker can reach the light fixture

The exterior metal paneling system installation is approaching completion along with the framing and drywall of the existing wings. Install of finishes is ongoing throughout the building which includes casework, wall and ceiling tile, and classroom flooring. The basketball hoops have been placed in the main gym with final connections being completed. Epoxy flooring has been placed in the kitchen area and the elevator contractor has begun to install the elevator rails and car within the elevator shaft. Installation of doors and hardware will begin shortly after framing and drywall is complete within the building.

 

Click here to see details of Lawrence Oliver for Oliver January 2025

Click here to see January 2025 Timelapse video

Click here to see January 2025 exterior drone footage

Click here to see January 2025 additional exterior drone footage

Click here to see January 2025 interior drone footage

Lawrence Public Schools Logo

Central Office

Family Resource Center

1 Parker Street, Lawrence, MA 01843
Phone 978-975-5900 Fax 978-722-8551