The exterior metal paneling system installation is approaching completion along with the framing and drywall of the existing wings. Install of finishes is ongoing throughout the building which includes casework, wall and ceiling tile, and classroom flooring. The basketball hoops have been placed in the main gym with final connections being completed. Epoxy flooring has been placed in the kitchen area and the elevator contractor has begun to install the elevator rails and car within the elevator shaft. Installation of doors and hardware will begin shortly after framing and drywall is complete within the building.