Oliver Construction Update

Oliver Construction Update Topping Off Ceremony
On November 29th, the Henry K Oliver construction team celebrated the Topping Off Ceremony, a milestone celebrating the last piece of steel being erected on the new school. The team was accompanied by the Oliver School Building Committee, students and school leaders, local elected officials, the MSBA, and Mayor Brian A. DePeña. This milestone recognizes the hard work of the construction workers and serves as a symbol of teamwork and achievement for this construction project. Please see the attached PDF for the drone footage of the event.
Click here to see details Lawrence Oliver for Steel Topping Off Ceremony
Click here to see Drone Video Highlight Footage
- Details
- Hits: 3150

Oliver Construction Update December 2023
In the month of November, the Henry K. Oliver Project celebrated a significant milestone in the topping-off ceremony with the last steel beam being hoisted up into the building. The steel erection scope is now almost complete with final bolt connections and welds being finalized. Concrete decks have been poured in the lower floors of the east side of the building addition. The team is now working on tarping off and setting up temporary heating in that section of the addition in preparation for interior scopes of work. Additional work includes drainage connections at the intersection of Short and Oak Street.
Click here to see details of Lawrence Oliver for December 2023
Click here to see December 2023 drone footage
- Details
- Hits: 3033

Oliver Construction Update October 2023
Structural steel and steel decking erection is ongoing on the east side of the new addition. Grade beams are being poured at the West end. In the existing building, window openings are being prepped for window installation. The building’s foundation and waterproofing have now been completed.
Click here to see details of Lawrence Oliver for October 2023
Click here to see October 2023 drone footage
- Details
- Hits: 2401

Oliver Construction Update November 2023
Structural steel and steel decking erection is ongoing on the east side of the new addition. Grade beams are being poured at the West end. In the existing building, window openings are being prepped for window installation. The building’s foundation and waterproofing have now been completed.
Click here to see details of Lawrence Oliver for November 2023
Click here to see November 2023 drone footage
- Details
- Hits: 2555

Oliver Construction Update September 2023
The team has now formed and poured concrete spread footings at the southern part of the new addition. Steel and metal decking have been delivered onsite and are being erected and installed throughout the site with the help of a crane. This will be an ongoing activity throughout the next couple of months. Construction has now moved its way into the existing building with the installation of floor-leveling material and preparations for window installations.
Click here to see details of Lawrence Oliver for September 2023
Click here to see September 2023 drone footage
- Details
- Hits: 3370
May 2022 - July 2023 Drone Footage Time Lapse
Consigli Construction has compiled drone footage from May 2022 to July 2023 to show the progress of the Henry K Oliver School Project site, enjoy the incredible changes that have been made. We are excited for what is still to come!
- Details
- Hits: 2764

Oliver Construction Update August 2023
The team continues to form and place concrete footings between the existing and new buildings. Foundation walls are being waterproofed, followed by install of foundation drainage and topped off with crushed stone. Underground plumbing installation is ongoing within the new concrete mat slab. The Learning Stairs are being formed and poured as the team works their way up to the existing building.
Click here to see details of Lawrence Oliver for August 2023
Click here to see July 2023 drone footage
- Details
- Hits: 2640

Oliver Construction Update June 2023
Placement of concrete foundation walls continues along the building perimeter. Existing utilities have been run across Haverhill Street and connected to the project site. Elevator shaft installation is nearly complete.
- Details
- Hits: 2626

Oliver Construction Update May 2023
Concrete mat slab placement is now complete. Rebar installation for the foundation walls and spread footings has started along with the CMU elevator shaft installation. Utility work has commenced onsite. The next step for the team is to prepare foundation walls for concrete pour.
Click here to see details of Lawrence Oliver for May 2023
Click here to see aerial footage of construction site for May 2023
- Details
- Hits: 2744

Oliver Construction Update April 2023
Soil excavation to its final depth has been completed throughout each section. Rebar installation has begun in the center section on top of the mud mat. Mud mat placement has occurred on the West side. Rebar installation has begun on the West side. Formwork is ongoing in the center section to prepare for the next concrete pour on 4/8. Excavation for site utilities has begun on the front side of the project site.
Click here to see details of Lawrence Oliver for April 2023
Click here to see aerial footage of construction site for April 2023
- Details
- Hits: 3116

Oliver Construction Update Mid-March 2023
The Henry K. Oliver Project in Lawrence achieved a significant milestone on Saturday, March 11th with the placement (concrete pour) of the first section of the building’s mat slab. The mat slab is a 4-foot thick, reinforced concrete placement located 18’ below grade, serving as the foundation for the Oliver School’s new 5-story addition. The first placement was roughly 10,000 sqft, utilizing 1,360 cubic yards of concrete delivered on site by 125 concrete trucks. Logistics was the biggest challenge for the project, ensuring that the number of trucks could get in and out of the required locations safely and within the necessary timeframes. The placement was planned for Saturday to ensure the project’s sole use of multiple concrete plants and to avoid traffic impacts to the surrounding community.
In the drone video shown above, you can see the beginning of the mat slab placement, which used three remote-controlled pump trucks with over 150 feet of reach to place the concrete in layers throughout the slab’s footprint. In the video you will also see the reinforcing rebar, which are steel rods that serves to strengthen the concrete and helping it resist cracking. Over 280,000 lbs. of rebar were installed for this first placement. The wooden structures seen within the rebar are to form plumbing trenches within the mat slab.
Click here to see aerial footage for the construction site for Mid-March 2023
- Details
- Hits: 2830

Oliver Construction Update March 2023
Excavation to its final depth on the West side has continued along with trucking of soil offsite. Rebar has been placed along with concrete forms on the East side in preparation of pouring concrete. Another base layer of concrete has been placed in the center in preparation for rebar to be formed in the center of the pit and proper waterproofing installation is also ongoing.
Click here to see details of Lawrence Oliver for March 2023
Click here to see aerial footage of construction site for March 2023
- Details
- Hits: 2771

Oliver Construction Update February 2023
There has been continued excavation of soils to reach the final depth for the building's proposed basement and continued bracing for support of excavation. A base concrete layer has been poured on the East side and additional preparations are being made for the pouring of the slab and foundation walls.
Click here to see details of Lawrence Oliver for February 2023
Click here to see aerial footage of construction site for February 2023
- Details
- Hits: 2517

Oliver Construction Update January 2023
There was continued removal and transportation of excavated soils and continued work to the bracing support for excavation. Subgrade preparation for concrete has started on the East side of the site along with installation of plywood for the concrete pour.
Click here to see details of Lawrence Oliver for January 2023
- Details
- Hits: 2316

Oliver Construction Update December 2022
Construction has begun on our new building, and crews have installed dewatering risers at the perimeter of the site. Horizontal bracing for SOE was also installed, with excavation down to the second cut.
Click here to see details of Lawrence Oliver for December 2022
- Details
- Hits: 2103