Ongoing work includes the installation of windows and curtainwalls, exterior brick veneer, terracotta and metal paneling, interior framing and drywall, ceiling grids for classrooms, and ceramic and porcelain tiling. Light fixtures have started to be delivered and installed on the project site. All electrical systems are now ready for permanent power turn-on. The interior window trim and sills have been advanced. The recharge drainage system of the Southern courtyard has been installed, and classroom casework has started to be placed throughout the building.